Replacement Units

The Right Equipment for the Project

Evapco’s unique induced draft, counterflow design is compact and versatile, making it ideal for replacement projects. Evapco also has a complete line of forced draft equipment for cooling towers, closed circuit coolers and condensers. Evapco has the right replacement unit regardless of the unit’s original manufacturer. ALL REPLACEMENT UNIT SELECTIONS ARE OPTIMIZED TO MINIMIZE TOTAL INSTALLED COST.

In most situations replacing an old unit with a new, more efficient Evapco unit results in a drastic reduction in horsepower; which, in turn, results in substantial energy savings. Reductions as high as 75% have been achieved through such replacements. The chart below depicts a few of the jobs Fox Engineering has done which have resulted in such energy savings.

Site Old Unit Total Output New Evapco Unit Total Output Energy Savings
Bonneville Power Administration Building
Portland, OR
Evapco LST 5-126
Evapco LST 5-126
40 HP
40 HP
Evapco AT 19-811
Evapco AT 19-811
20 HP
20 HP
50%
Pioneer Place
Portland, OR
Evapco LSTA 10-245
Evacpo LSTA 10-241
180 HP
130 HP
Evapco AT 212-624
Evapco AT 29-824
50 HP
50 HP
68%
World Trade Center
Portland, OR
BAC Forced Draft 150 HP Evapco AT 12-436B 50 HP (25×2) 66%
Kaiser Permanente Building
Portland, OR
BAC VST-650B 100 HP Evapco AT 29-624 40 HP 60%
Hilton
Portland, OR
Marley 68-1449 50 HP Evapco AT 212-124 30 HP 40%
Wah Chang
Albany, OR
BAC 3000 Series 120 HP Evapco USS 212-736 100 HP 17%
OSU Weniger Hall
Portland, OR
(2) BAC FXV-444 40 HP (2) Evapco ESWA 102-33J-2 30 HP 25%
Montgomery Park
Portland, OR
Evapco PMT 120 HP Evapco AT 224-818L 80 HP 33%
Intel HF-1
Hillsboro, OR
BAC CFT-2425C 360 HP Evapco AT 224-518 120 HP 66%
Public Service Building
Portland, OR
(4) Marley 7215-H1 40 HP (2) Evapco AT 19-411 20 HP 50%
Cowlitz County Administrative Building
Kelso, WA
BAC V1-100-2 20 HP Evapco ESW 77-36H 7.50 HP 63%
SAIF Corporation
Salem, OR
BAC VLT-300A 40 HP Evapco AT-414 15 HP 63%
Tuality Hospital
Hillsboro, OR
BAC VXT-470RC
BAC VCT-450A
60 HP
60 HP
Evapco REP 217-611 30 HP 75%
Hewlett-Packard
Corvallis, OR
Marley NC 8617 60 HP USS 212-124 30 HP 50%
Heathman Hotel
Portland, OR
Evapco LSTB-5312 25 HP Evapco LPT -829 15 HP 40%
Blue Cross Building
Portland, OR
BAC E-120
BAC E-180
15 HP
30 HP
Evapco ICT 4-712
Evapco ICT 4-812
Evapco AT 8-69B
6 HP
10 HP
15 HP
31%
Pioneer Square
Portland, OR
BAC VXT-25C 5 HP Evapco ICT 4-74 2 HP 60%
Sandvik Medical
Oregon City, OR
Evapco LSW-87A 20 HP Evapco ATW 9-5J9-Z 15 HP 25%
ADP Plaza
Portland, OR
Evapco LSW-174A 50 HP Evapco LSTB 5118H 30 HP 40%
Central Oregon Community Hospital
Redmond, OR
BAC VXT 150 20 HP Evapco AT 19-58 7.5 HP 63%
Fred Myer
Beaverton, OR
BAC VXI-180
BAC VXI-70
40 HP
20 HP
Evapco AT 19-614 20 HP 67%
4th & Market Building
Portland, OR
BAC VXT 135
BAC E-200
15 HP
15 HP
Evapco AT 19-76
Evapco AT 19-59
7.5 HP
10 HP
42%
Housing Authority of Portland
Portland, OR
Evapco LSW 43C 20 HP Evapco ESW 77-23H 7.5 HP 63%